Stage 13

Titles Due: 1st Quarter 2023
Scheduled
In Progress
Complete
Plans & Permits
Completed
This primary phase involves Council and Authority acceptance of documentation including engineering design to confirm physical works may be allowed to commence at your site.
Earthworks
Completed
This is where the big machinery first rolls in and involves preparation of the site to achieve design lot levels including site scraping, shaping the existing ground, and construction of retaining walls if required.
Sewer & Drainage
Completed
The essential infrastructural underpinnings to ensure the health and wellbeing of the future community are laid down here, connecting every lot to the waste and water systems.
Road Boxing, Kerb & Channel
Completed
Here we see things really start to come together as the ground is prepared in order to lay down the lower layers of road pavement. Water and gas mains are also installed, and the kerb and channel – essentially the road guttering system – is put into place.
Electrical & Communications
Completed
With kerb and channel works complete, in this phase trenches are dug for the running of electrical and telecommunications cabling and wiring, preparing the way for power, phones and the internet to be connected.
Footpaths & Asphalt
Completed
The ground goes through another round of preparation to enable the construction of footpaths, as well as for the topsoil of the community’s nature strips. Significantly, this phase also sees middle pavement layers constructed and roads take shape with the laying of asphalt.
Completion & Inspection of Works
Completed
Things have really moved along by this point. The Council and Service Authority perform final inspections before signing off on constructed works including roads and services. Final documentation is provided to Council, facilitating a Statement of Compliance for the development stage.
Titles Office and Settlement
Completed
Have some champagne ready for this major milestone. This is the final step of the construction phase, where registration of individual lots from each stage occurs at the Titles Office, earmarking your block for settlement and opening it up for you to begin the building of your home.

What happens next?

Congratulations! We’re happy to report that construction work and installation of essential services for this stage is complete. The relevant authorities have audited your essential services and accepted them as compliant. As such, a Statement of Compliance or ‘SOC’ has now been issued, and we have commenced the process to register titles with the Lands Titles Office. Although we do not handle the title registration itself, we anticipate titles to be registered within approximately one fortnight. We, therefore, advise that you speak to your financier, solicitor and/or conveyancing consultant to prepare for settlement. Please ensure you contact the team in our Sales Office should any questions occur. From all of our team, we wish you the best on the construction of your new home!